Gazzettino di Pordenone
Note the CPS
Budoia - (SS) The five-page note was sent by the CPS, Ltd. owns the quarries and Val Longa Lamata Caneva, the municipalities of Budoia, Caneva, Polcenigo and the Province to make some clarification on that matter, between the Tar and appeals protests, is taking the bench in the country. A sort of calling card with which the company talks about his past, "an environmental outcome reached the quarry Lamata seen and appreciated by regional bodies for the environmental quality of its reorganization," and has called his future with Val Longa a project "initiated by the analysis of the reduction of environmental impacts, most notably those linked to the visibility of the cultivation, production of dust, noise and emissions into the atmosphere and, last but not least, the road connected. " And it is this last point that has raised protests from residents who fear an increase in heavy traffic with the opening of new quarry. A fear that CPS tries to dispel a few providing data on the basis of the raw material that the quarry should provide the cement of Torviscosa (Grigolin draft submitted by the Group, co-owner of the CPS), "The demand for cement comes from the CPS was estimated at about 10 000 tons a day which would mean a daily traffic of trucks along the Sarone-Budoia of 24 trips and a similar return over a nine-hour day, or a transit every 22 minutes. " The note then points out that the municipal administration of Budoia in 2006, after saying no to the passage of vehicles within the country, had a favorable opinion to the realization, at the expense of the CPS, a piece of road from the level crossing adjacent to the industrial zone along the railway reached the train station. Then, after the problems occurred for the construction of cement Torviscosa, the CPS has asked the region to use the station to deliver Budoia at other sites in the Grigolin the amount of material for the project. "Production will begin no sooner than three years," the statement concludes noting that "the environmental compatibility is not an authorization. The new road will be examined again by the local authority. "
0 comments:
Post a Comment